sur Barton Gold Holdings Limited (isin : AU0000153215)
Barton Gold Completes 5,064m Drilling at Tunkillia Project
Barton Gold Holdings Limited has completed a 5,064m reverse circulation drilling program at the Tunkillia Gold Project. This initiative aims to expand the JORC Mineral Resources Estimate (MRE) and support an Optimised Scoping Study.
In recent months, Tunkillia's JORC MRE reached 1.5Moz Au. The project's Initial Scoping Study suggested a gold production rate of approximately 130koz annually, with an all-in sustaining cost of A$1,917/oz. The project shows a 40% equity internal rate of return and a payback period of 1.9 years.
Barton targets growth in the MRE and seeks to enhance project economics by optimizing key cost factors. The company plans to finalize the Optimised Scoping Study soon, considering options for its initial Stage 1 operation.
R. H.
Copyright © 2024 FinanzWire, tous droits de reproduction et de représentation réservés.
Clause de non responsabilité : bien que puisées aux meilleures sources, les informations et analyses diffusées par FinanzWire sont fournies à titre indicatif et ne constituent en aucune manière une incitation à prendre position sur les marchés financiers.
Cliquez ici pour consulter le communiqué de presse ayant servi de base à la rédaction de cette brève
Voir toutes les actualités de Barton Gold Holdings Limited