COMMUNIQUÉ DE PRESSE

par Silver Tiger Metals Inc. (isin : CA82831T1093)

Silver Tiger Intersects 32.0 Meters of 1.36 G/T Gold Equivalent Within 81.1 Meters of 0.94 G/T Gold Equivalent in the Stockwork Zone

HALIFAX, NS / ACCESSWIRE / April 30, 2024 / Silver Tiger Metals Inc. (TSXV:SLVR)(OTCQX:SLVTF) ("Silver Tiger" or the "Company") is pleased to provide an update on the Company's ongoing Pre-Feasibility Study ("PFS") drilling program on the Stockwork gold deposit on its El Tigre Project in Sonora, Mexico. Silver Tiger has completed 23,500 metres of a 25,000 metre drilling program focused on expanding the Mineral Resource, up-grading the classification, completing metallurgical testwork and geotechnical studies as it progresses from an exploration to a development project. The value-added PFS progress is on schedule for publication in H2-2024.

Three main areas of the Stockwork gold deposit are being targeted and show potential for expansion: a) the footwall, b) the hanging wall and c) bottom ‘keel'. After releasing the first 75 drill holes of the program, the Company is pleased to announce conversion, expansion and derisking of the potential ‘Starter Stockwork Zone'.

The Stockwork gold deposit, comprised of the Footwall, Hanging Wall and high-grade Keel Zones, is seen in the below highlighted intercepts:

  • Drill hole ET-23-541: 79.5 metres grading 0.75 g/t gold equivalent or 56.1 g/t silver equivalent from 92.5 to 172.0 metres, consisting of 0.52 g/t gold and 17.4 g/t silver INCLUDING 26.5 metres grading 1.19 g/t gold equivalent or 89.3 g/t silver equivalent from 94.0 to 120.5 metres consisting of 1.08 g/t gold and 8.0 g/t silver in the Hanging Wall Zone.
  • Drill hole ET-23-543: 40.2 metres grading 1.21 g/t gold equivalent or 90.7 g/t silver equivalent from 148.0 to 188.2 metres, consisting of 0.84 g/t gold and 27.9 g/t silver INCLUDING 23.0 metres grading 1.72 g/t gold equivalent or 129.3 g/t silver equivalent from 152.0 to 175.0 metres consisting of 1.22 g/t gold and 37.9 g/t silver in the Keel Zone.
  • Drill hole ET-23-548: 71.0 metres grading 0.67 g/t gold equivalent or 50.6 g/t silver equivalent from 0.0 to 71.0 metres, consisting of 0.62 g/t gold and 3.9 g/t silver INCLUDING 18.5 metres grading 1.36 g/t gold equivalent or 101.7 g/t silver equivalent from 39.5 to 58.0 metres consisting of 1.32 g/t gold and 2.4 g/t silver in the Footwall Zone.
  • Drill hole ET-23-550: 81.1 metres grading 0.94 g/t gold equivalent or 70.3 g/t silver equivalent from 43.5 to 124.5 metres, consisting of 0.90 g/t gold and 3.0 g/t silver INCLUDING 32.0 metres grading 1.36 g/t gold equivalent or 102.1 g/t silver equivalent from 54.0 to 86.0 metres consisting of 1.31 g/t gold and 3.6 g/t silver in the Footwall Zone (Figure 2) and 21.0 metres grading 0.68 g/t gold equivalent or 50.1 g/t silver equivalent from 0.0 to 21.0 metres, consisting of 0.53 g/t gold and 10.5 g/t silver at the top of the hole.

Silver Tiger's CEO, Glenn Jessome, stated, "As we continue receiving promising assay results, it is apparent that the developing "Footwall" and "Keel Zones" shows excellent grade and continuity." Mr. Jessome further stated, "The results may increase the updated MRE associated with the PFS-level study, as well as further de-risk the project."

Figure 1 : Stockwork Zone - Plan View

Figure 2: Stockwork Zone Cross Section 4100N

Highlights from the on-going Pre-Feasibility Study Drilling Program include the following:

  • Expanding known mineralization by 10 to 15%, to the footwall and hanging wall zones, as well as the higher-grade ‘keel' at PEA pit bottom associated with the El Tigre and SK Veins;
  • Converting first two to three years of mineralized material in the potential ‘Starter Stockwork Zone' from Indicated Mineral Resource to Measured;
  • Converting a significant portion of the 2 km strike length ‘ultimate' PEA pit-constrained Inferred Mineral Resource to Indicated;
  • Completion of enhanced PFS Metallurgical Drilling, with samples underway comminution and leach testing; and
  • Completion of enhanced PFS Geotechnical Drilling, with samples undergoing testing.

Mineral Resource Drilling

P&E Mining Consultants Inc. ("P&E") of Brampton, Ontario completed the initial MRE in 2017. On Oct 27, 2023, P&E released an updated El Tigre Project NI 43-101 and NI 43-01 F1 compliant MRE technical report titled "Technical Report and Updated Mineral Resource Estimate of the El Tigre Silver-Gold Project, Sonora, Mexico" authored by William Stone, Ph.D., P.Geo.,Yungang Wu, P.Geo.,

Fred H. Brown, P.Geo., Jarita Barry, P.Geo., David Burga, P.Geo., D. Grant Feasby, P.Eng., Eugene Puritch, P.Eng., FEC, CET and David Salari, P.Eng. The MRE has a pit-constrained Indicated Mineral Resource totaling 43.0 million tonnes containing 818 thousand ounces AuEq grading 0.59 g/t AuEq; and a pit-constrained Inferred Mineral Resource of 11.5 million tonnes containing 267 thousand ounces AuEq grading 0.72 g/t AuEq (see update MRE press release dated September 12th 2023).

PEA-level bench optimization of the pit-constrained Mineral Resource highlighted the higher-grade (~0.80 gpt AuEq), low strip ratio (~0.3) potential Starter Stockwork Zone which contains 5.7 million tonnes of mineralized material (see PEA press release dated November 1st, 2023). Recommendations of the PEA-level study included increasing Mineral Resource confidence in potential ‘Starter Stockwork Zone' and additional exploratory drilling to target the 1) Footwall, 2) Hanging Wall and 3) ‘Keel' areas of the Stockwork Zone. P&E were again retained to lead the current El Tigre PFS-level study with 23,500 metres of the program complete (Figure 1). Complete and final assay results are listed in Table 1.

Below, highlighted intersections are enumerated with reference to the three (3) zones targeted:

  • Drill hole ET-23-541: Confirms location and grade of the Hanging Wall Zone, and downhole, expands depth of high-grade Keel Zone (Figure 1);
  • Drill hole ET-23-543: Expands depth and strike of Keel Zone over the 2023 MRE (Figure 1);
  • Drill hole ET-23-545: Expands Footwall Zone by 20 m to east over 2023 MRE (Figure 1); and
  • Drill hole ET-23-550: Expands Footwall Zone by 40 m to east over 2023 MRE (Figure 2).

Table 1-Mineral Resource Drill Hole Results

AuEq
Total (2)

AgEq
Total (2)

Hole IDCommentFromToLength(1)GoldSilver
mmmg/tg/tg/tg/t
ET-23-532STOCKWORK ZONE22.074.552.50.485.30.5641.7
including29.557.027.50.735.40.8060.1
ET-23-533STOCKWORK ZONE30.044.014.00.8624.01.1888.2
STOCKWORK ZONE59.766.56.80.362.20.3929.3
STOCKWORK ZONE121.2144.022.90.0428.70.4231.6
including141.0144.03.00.08102.01.44108.0
ET-23-534STOCKWORK ZONE8.416.88.50.1415.40.3526.2
STOCKWORK ZONE38.757.518.90.452.00.4735.5
ET-23-535STOCKWORK ZONE15.529.113.60.853.80.9067.6
Mining VOID29.132.23.1****
STOCKWORK ZONE32.250.818.60.137.10.2317.1
STOCKWORK ZONE56.564.07.50.295.00.3627.1
ET-23-536STOCKWORK ZONE89.099.010.00.783.10.8261.4
STOCKWORK ZONE3112.3158.045.70.387.90.4936.4
Mining VOID144.1145.51.4****
STOCKWORK ZONE123.0133.010.00.588.50.7052.4
STOCKWORK ZONE197.0207.010.00.1415.70.3526.1
ET-23-537STOCKWORK ZONE88.090.02.01.392.51.42106.5
STOCKWORK ZONE101.0140.039.00.3711.80.5239.3
STOCKWORK ZONE168.0182.014.00.3015.20.5037.7
El Tigre vein206.0210.04.02.9346.53.55266.6
ET-23-539STOCKWORK ZONE0.042.742.70.3642.90.9470.2
including22.541.218.70.4374.81.42106.8
ET-23-540STOCKWORK ZONE4128.0173.045.00.509.10.6346.9
including158.0162.54.50.8552.11.54115.6
ET-23-541STOCKWORK ZONE92.5172.079.50.5217.40.7556.1
including94.0120.526.51.088.01.1989.3
Seitz Kelly187.0197.210.20.1426.80.5037.6
ET-23-543STOCKWORK ZONE5
Voir toutes les actualités de Silver Tiger Metals Inc.